Computing Farm
2019:
* Hardware
Worker Node (WN):
Typically
SuperMicro Blade:
415 64-bit machines: 2 x CPU, 6-12 core/CPU
Total:
132813 HEP-kSI2k
Total:
9200 core for batch
2018:
* Hardware
Worker Node (WN):
Typically
SuperMicro Blade
* 275 64-bit machines: 2 x CPU, 6-10 core/CPU
Total:
4720 core/slots for batch
2017:
* Hardware
Worker Node (WN):
Typically
SuperMicro Blade
- 100 64-bit machines: 2 x CPU (Xeon X5675 @ 3.07GHz, 6 cores per processor); 48GB RAM, 2x1000GB SATA-II; 2x1GbE.
- 148 64-bit machines: 2 x CPU (Xeon E5-2680 v2 @ 2.80GHz, 10 cores per processor), 64GB RAM; 2x1000GB SATA-II; 2x1GbE.
Total:
4160 core/slots for batch.
2016:
* Hardware
The Computing farm T1_RU_JINR includes:
- 100 64-bit machines: 2 x CPU (Xeon X5675 @ 3.07GHz, 6 cores per processor); 48GB RAM, 2x1000GB SATA-II; 2x1GbE.
- 120 64-bit machines: 2 x CPU (Xeon E5-2680 v2 @ 2.80GHz, 10 cores per processor), 64GB RAM; 2x1000GB SATA-II; 2x1GbE.
Total: 3600 core/slots for batch.
2014:
* Hardware
The Computing farm T1_RU_JINR includes:
- 5 crates Processor blade Supermicro.I. Computing Element Accounting farm.
- 5 crates Processor blade Supermicro. 100 machines: 2xCPU (Xeon X5675 @ 3.07GHz); 48GB RAM; 2x1000GB SATA-II; 2x1GbE.
Total : 1200 cores / slots in the batch.